Substation Clearance


SUBSTATION GROUND CLEARANCES
Nominal System Voltage
    Clearance in meters  (Minimum)
11KV
       2.75m
33KV
       3.7 m
66KV
       4.0 m
132KV
       4.6m
220KV
       5.5m
440KV
       8.1m






Minimum Clearances (meters)
33KV


132kv


220kv


400kv


765kv



Phase –Phase  (meters)

0.320


 1.3

  2.1


 4.2


  9.4


Phase-Earth    (meters)

0.320


 1.3


 2.1


 3.5


  6.4


Sectional clearance  (meters)

 3.0

 3.8

 5.0

 6.5

  10.3






Comments

Popular posts from this blog

ACB Tripping settings

Transformer Magnetic Oil Gauge Indicator

HIGHER EFFICIENCY MOTORS (HEM)