Transformer Preventive Maintennace

PPM for Transformer:

  1. Informing department and getting Approval .
  2. Ensuring incoming & outgoing breakers in off position.
  3. Applying LOTO Tags .
  4. Using proper PPE while carrying out PPM.
  5. Cleaning T/F with dry cloth .
  6. check & Reticify Oil leakages.
  7.  check silica gel condition.
  8. check OTI & WTI control wiring & tightness .
  9. check OLTC Belt condition .
  10. Checking Manual operation of oltc .
  11. checking buccholz's relay alarm & trip test.
  12. checking for damaged nuts & bolts.
  13. check Neutral to Earth Resistance .
  14. HT To LT Megger values need to check . 


2500 KVA TRANSFORMER

Comments

Popular posts from this blog

ACB Tripping settings

HIGHER EFFICIENCY MOTORS (HEM)

Transformer Magnetic Oil Gauge Indicator